Working with both Wilkinson Ayre and TP Bennett to specify the right stone for the new Citibank offices in Canary Wharf was a challenge on so many fronts. The process took almost five years, from the first discussions to fixing the last piece of stone. Of course, the aesthetic aspect was of crucial importance for a material to be considered, and with rigorous technical and environmental standards to meet, it was one of the most challenging projects to be involved with, yet also the most rewarding. An EPD was required, and therefore applied for, with the accreditation awarded during the initial specification, highlighting how much time and effort went into this.
With procurement starting such a long time ago and extra elements being added along the way, time also became a challenge, specifically in keeping the same selection from start to finish. In fact, we graded the Grigio Perla as A, B, and C according to the size of the inclusions making up the surface of each tile. With a mix of each type often apparent in just one slab, the cutting process took a lot longer than we could have predicted. Add to this a laying process that called for the fixing team to follow a carefully considered pattern repeat, to spread the types evenly while maintaining a random appearance, and it is clear that everything was considered. The result is pretty breathtaking, and we are very proud to be part of such an incredible project.












